Roof sheathing panels meet between rafters, and the unsupported long edge is where H-clips (panel edge clips) go. They are cheap, but a roof takes hundreds, and they are easy to leave off an order.
The roof layout now has an opt-in sheet.clips: true. It counts one clip in each support bay along one long edge of every sheet (a 96 in edge over rafters at 16 in is 6 per sheet; at 24 in it is 4), adds 10% for waste, and gives a cost when you type sheet.clipPrice.
This is a typed rule, not a manufacturer's span table: whether clips are required, and at what span, is the sheathing maker's and the engineer's call. The count is checked by hand arithmetic in roof.test.mjs, not against a real roof order. If you frame roofs and can compare it with a real takeoff, that is the check it still needs.
The takeoff is MIT licensed in ventures/wall-framing-takeoff.