Point-to-point fault current reads low down a long feeder: a free calculator for the NEC 110.24 label

A free available fault current calculator: every panel from the transformer down, the kA rating check, the 110.24 label, and where point-to-point reads low.

Service equipment in other than dwelling units has to carry a field-marked label with the maximum available fault current and the date it was worked out (NEC 110.24). The same number decides whether every breaker and panelboard downstream is rated for what can reach it. The usual hand method is point-to-point: start from the transformer's fault current and multiply down each feeder by 1 / (1 + f).

We built a free calculator that solves the same system two ways, and the comparison turned up something worth knowing.

The example

A 1500 kVA, 3.5 % transformer at 480 V. Full-load current is 1,804 A, so on an infinite bus the secondary fault current is 1,804 / 0.035 = 51,549 A. Reduce the impedance 10 % for the nameplate tolerance and add four times 1,804 A of running motors, and the service sees 64,493 A; the label reads 64,500 A.

Downstream:

PanelNameplate %Z, no motorsWith tolerance and motorsMagnitude sumRating
Service51,549 A64,493 A64,493 A65 kA
MDP (25 ft, 6 x 400 kcmil)49,031 A60,598 A60,491 A65 kA
LP-1 (150 ft of 1/0 beyond)12,515 A13,008 A12,281 A10 kA
LP-2 (75 kVA, 4.5 % to 208 V)4,315 A4,795 A4,747 A10 kA

LP-1, a lighting panel with a 10 kA rating, is over whichever way you count.

Where point-to-point reads low

The point-to-point multiplier f = 1.732 x L x I / (C x n x E) works out to adding each impedance's magnitude: the cable's |Z| is added to the source's |Z| as if both pointed the same way. They don't. The service source is X/R 6, mostly reactance; 150 ft of 1/0 copper is about 0.102 ohm of resistance against 0.063 ohm of reactance per 1000 ft, mostly resistance. Their complex sum is shorter than the sum of their lengths, so the real fault current is higher: 13,008 A at LP-1 against 12,281 A by magnitudes, 5.6 % low. Close to the transformer, where one impedance dominates, the two agree (0.2 % at the MDP).

5.6 % is small next to the uncertainty in a utility's figure, but it always errs in the unsafe direction for an equipment rating check, and it grows where the answer matters most: at the small panels at the end of long feeders, which are the ones with 10 kA and 14 kA ratings. The test suite checks that the calculator's magnitude sum reproduces the point-to-point f and M formulas exactly, for a feeder and for a downstream transformer, so the comparison is like for like.

A second thing the table shows: the impedance tolerance moved LP-2 by 11 % (4,315 A to 4,795 A), more than it moved the service, because LP-2's own 75 kVA transformer dominates its impedance and the allowance applies to it as well.

What the tool does

Available Fault Current Calculator takes the service transformer (kVA, %Z, X/R, a tolerance allowance and an optional utility fault MVA) or the fault figure from the utility, motor contribution at the service, and any number of feeders, each fed from the service or an earlier panel, with size, copper or aluminium, parallel sets, length, steel or non-steel conduit and an optional step-down transformer. For every panel it gives:

  • the symmetrical fault current, impedances added as complex numbers;
  • the magnitude-sum figure and how far it reads low;
  • X/R and the peak current (IEC 60909 kappa);
  • a check against the panel's kA rating;
  • label text with the date you pick, and a CSV of everything.

Conductor resistance is computed from the area and the resistivity of copper or aluminium, with the IEC 60287 skin-effect factor, not copied from a code table. Reactance defaults to 0.050 ohm per 1000 ft (a quarter more in steel conduit) and can be typed per feeder. It runs in the browser; nothing is uploaded.

Not modelled: ground faults and the line-to-neutral fault on a center-tapped secondary, arc flash, generators and inverters, series ratings and fuse let-through. A stamped short-circuit study is the document of record; this is a check, verified by hand arithmetic and unit tests only. The worked steps are in the 110.24 label guide.

All writing · More in Tools and projects · All tools and research