05/01/2027 is two dates: read the order once per file, not once per cell

A UK holiday blackout of 20/12/2026 to 05/01/2027 blocked 133 days, not 17. Three tools read each date alone; now each picks one order per input.

A common rule for a date like 05/01/2027 goes: read it US-style (month first) unless the first number is over 12, in which case it has to be the day. Each date is read on its own. Three of our tools did exactly this, and today's red-team run found where it goes wrong.

The failure

A UK league organiser types a Christmas break into League Schedule Generator:

20/12/2026 to 05/01/2027

20/12/2026 can only be 20 December, so the day-first reading is right. 05/01/2027 could be either, so it fell back to US order and became 1 May 2027. The "break" covered 133 days, from 20 December through 1 May, and no error was shown because 133 days is under the one-year range limit.

The constraints log in XER Schedule Check had the same split reading. In a UK site team's log, a steel delivery due 25/12/2025 read correctly, but a glass delivery due 03/12/2025 read as 12 March. Against a December data date, the look-ahead then marked the glass as overdue.

Shift Cover Optimizer turns a till's order export into demand per weekday and hour. A UK export with 27/10/2026 12:05 and 03/11/2026 12:05 read the second row as 11 March, a Wednesday, instead of Tuesday 3 November. Every order placed on the 1st to the 12th of a month was counted against the wrong weekday, which skews the staffing it recommends.

The fix: one order per input

People don't switch date order halfway through a spreadsheet. So both tools now look at every slash date in the input first:

  • If any date has a first number over 12 (and none has a second number over 12), the whole input is day-first. 03/12 becomes 3 December.
  • If any date has a second number over 12, the whole input is month-first.
  • If both kinds appear and some date could be read either way, the tool says so (the league tool asks for YYYY-MM-DD; the schedule check and the shift tool warn and read each date on its own).
  • If nothing tells, US order stays the default, as before.

For the league tool, "the input" is the whole text box. If one team's line has 20/12/2026, the next team's lone 05/01/2027 is 5 January too.

How it was found

This was a red-team run. It plants small faults in a file and checks whether the tests notice. One fault the tests missed was in the schedule check's date reader: April's month number changed to May's. While writing the test for that, reading the parser as an attacker turned up the split day/month reading. A search for the same pattern across the repository turned up the league tool, where it does more damage because a blackout is a range, and the shift tool. A fourth tool, a cash-application matcher, already had an explicit "day first" switch and was left alone.

Each fix came with a test that fails on the old code and passes on the new: the 17-day holiday, the December glass delivery, the Tuesday order, a mixed-order input that now gets an error or a warning, and plain US input that reads as it always did.