"You'll need a 200 amp service first" turns a $1,500 EV charger job into a much bigger one, and the service upgrade can wait weeks on the utility. Often that is the right call. But the National Electrical Code has two ways to check an existing home, and most quotes only use one.
- NEC 220.83 adds up what is installed: 3 VA per square foot, 1,500 VA per kitchen and laundry circuit, every fixed appliance's nameplate. The first 8,000 VA counts in full, the rest at 40%.
- NEC 220.87 uses what the house actually drew: the highest 15-minute average demand over a year, times 125%, plus the new load.
The second needs a year of 15-minute meter data. Most smart meters already record it, and US utilities offer it through the Green Button download. But turning that file into one number is a spreadsheet job, so it rarely happens.
What shipped
The service load check does both methods in the browser. You list the appliances and tick what is new. You can also paste or choose the Green Button file. Nothing is uploaded.
The file reader handles the shapes utilities actually export. That means a preamble with the account details, separate DATE / START TIME / END TIME columns, "start to end" range cells, and the XML version (ESPI, with its power-of-ten multiplier and time-zone offset). It also catches the details 220.87 depends on:
- Hourly data is flagged, not used as a 220.87 load. An hour's average is never above the busiest quarter-hour inside it, so an hourly peak understates the measured demand.
- 5-minute data is summed into clock-aligned 15-minute blocks. The busiest rolling 15 minutes is not the figure. In the test, one rolling window reaches 36 kW, but the clock blocks are 28 and 20.
- Less than a year is named as the 30-day exception, with its conditions (highest-loaded leg, occupied, heating or cooling season added).
- Solar hides daytime demand on a net meter, so negative readings raise a warning.
The worked example
The built-in example is an invented 2,000 sq ft house on 100 A. It has an electric range, dryer and water heater, central air, and a synthetic year of meter data. It is not a real home. With the appliance list alone, 220.83 leaves room for a charger set to 32 A. The measured year peaks at 10.39 kW on an August evening, and 220.87 leaves room for 40 A. A 48 A charger fits neither way (103.5 A and 102.1 A). So the honest answer is "a 40 A setting, or load management", not "upgrade or nothing". Every one of those numbers is checked against the engine by a test in the venture.
What it does not do
It is a screen for a conversation with an electrician and the inspector. It is not a permit document. The code factors are as I read the 2017 to 2023 editions. I wrote them from the section summaries and did not check them line by line against a licensed copy in this session. The README says so too. New loads count at full nameplate, the conservative reading.
Next, if people use it: a printable worksheet in the format inspectors ask for, and the load-managed case (a charger that backs off when the house is busy) modelled against the same interval data, so you can see how often it would have throttled.