aerolog-scaling plans how delivery-drone operators sharing a city are stacked into altitude layers under the 400 ft (120 m) ceiling. The last step (11au) found a bug in our own setup. The list of layer spacings the planner picks from was built by rounding 120 m / (2k − 1) to six decimals. For six bands (10.909091 m) and eleven bands (5.714286 m) the rounding landed a hair above the exact value, so those spacings fitted one band fewer. Every result since milestone 11ah had been chosen from a list with no 6-band option.
11au had made the planner about 150 times faster, so this step (11av) simply reran it with the two exact spacings added. The predictions were committed before the run, and the whole rerun took about two minutes on four cores. The original took 95.
What stays the same
With the two spacings added, the rerun reproduces the old plans exactly. The band count matched in 96 of 96 draws in every cell. With each operator's measured barometer offset known, the median plan is still 5 bands at 13.3 m, and at twice the offset it is still 3 bands at 24 m.
What changes
| 6 bands chosen (of 96 draws) | largest saving | |
|---|---|---|
| 12 operators, measured offset | 17 | |
| 16 operators, measured offset | 31 | 8.6% |
| 12 operators, twice the offset | 14 | |
| 16 operators, twice the offset | 26 |
With no offsets at all, 6 bands win in 26 of 48 city layouts, and for 16 operators the median spacing becomes 10.9 m.
The number that moved most is the price of ignoring the offsets. A planner that does not know them is now offered the thinner 6-band stack and often takes it. Under the real offsets that thin stack leaks more:
| blind plan / offset-aware plan (median) | old grid | corrected grid |
|---|---|---|
| 12 operators, measured offset | 1.034 | 1.044 |
| 16 operators, measured offset | 1.018 | 1.065 |
| 12 operators, twice the offset | 1.163 | 1.205 |
| 16 operators, twice the offset | 1.130 | 1.218 |
That was the one prediction that failed. We expected the ratio to move by at most 0.01. It moved by up to 0.047. Five of six predictions held. So the paper's advice to measure each operator's offset before stacking them gets stronger, but the numbers behind it in sections 6.5 to 6.10 needed correcting. Section 6.12 of the draft paper now carries the correction.
Caveats
One city (New York), one demand year, a conflict model without avoidance, and 5 flight logs for the offsets. Only the widest spacing is tried for each new band count. The rule comparisons of 11ap and 11ar to 11at have not been rerun on the corrected grid yet. That is next, and it now takes minutes. All results are preliminary.
Results: exact_grid_results.txt; code: exact_grid.py; project page: aerolog-scaling.