Scale the drone's Remote ID protection radius with track age: a fifth of the hold at 30 s shadows

A protection radius that grows with Remote ID track age cuts a drone's transit hold to a fifth of one fixed radius, once the burst law is known.

The aerolog-scaling programme has been pricing a hold-until-clear rule. The rule makes a delivery drone wait before it climbs or descends through another operator's altitude layer, until no other drone is predicted within a protection radius. Over broadcast Remote ID, the newest message from each nearby drone can be old, because a building blocks the receiver for tens of seconds at a time. Yesterday's step compared two ways to handle that. One is a single radius sized for every track age. The other is a maximum track age: a drone that has heard nothing for longer than the cut-off waits.

Under geometric bursts the fixed radius was about 3.5 times cheaper. But its collision guarantee depends on the shape of the burst-length tail, which nobody has measured for Remote ID. The cut-off's guarantee does not. This step asks what lies between the two: a radius that depends on how old each track is.

The rules compared

All rules meet the same target of 1e-7 collisions per flight hour. They run on the same 48 New York layouts, the same stored hold curves and the same geometric bursts, with one receiver channel per drone, so a single shadow makes every track stale at once.

  • Fixed radius (FR): one radius for all ages.
  • Age-scheduled radius (OR-W): each track age gets its own radius, chosen to minimise the mean hold. The drone may also wait for a fresh message at any age. FR and the cut-off are special cases of this rule.
  • Capped schedule (OR-C): the same, but no single decision may carry more than ten times the mean miss probability.

What it costs

These are hold times per flight for a <1 m/s speed accuracy band with half the messages lost, for 12 and 16 operators. Every figure is in track_age_results.txt.

mean burstfixed radiusage-scheduled (OR-W)capped (OR-C)
30 s, today's demand0.773 / 0.635 s0.171 / 0.148 s0.172 / 0.149 s
100 s, today's demand14.1 / 11.1 s1.29 / 1.05 s1.43 / 1.17 s
100 s, ten times demand1.1e5 / 2.0e4 s29.8 / 22.4 s31.3 / 24 s

Using a small radius for fresh tracks and a larger one for old tracks cuts the hold to about a fifth at 30 s bursts and a tenth at 100 s. Even the best speed band (<0.3 m/s) saves about 30% at 30 s bursts. Waiting only becomes part of the optimum at ten times the demand, or when speed reports are poorer than 1 m/s.

The catch

The unconstrained optimum meets the mean target by accepting more risk on the oldest tracks. At 30 s bursts, 0.6% of decisions carry over ten times the mean miss probability, and the worst carries 253 times. Capping every decision at ten times the mean costs almost nothing: under 1% more hold at 30 s bursts and 11% at 100 s.

The bigger catch comes from yesterday's step. The schedule is sized for an assumed burst law, just as the fixed radius is. If the real tail is heavier, the schedule is no more certifiable than one radius is. So the recommendation has two stages. Until a receiver's burst-length law is measured, certify the cut-off. After it is measured, carry a capped age schedule. Combining the two, an age schedule under a certified cut-off, is the next step. This step does not price it.

Limits

This is preliminary. 4 of 6 pre-registered predictions held. The analysis freezes a track's age for the length of a hold, gives each receiver one shared channel and models geometric bursts only, with burst lengths swept. Every number in the programme's paper, Section 6.10(g), is checked against the results file.

All writing · More in Research findings · All tools and research