MAINTENANCE PLANNER · FREE CMMS · PLANTS, WORKSHOPS, FACILITIES, FLEETS · RUNS IN YOUR BROWSER

Keep preventive maintenance on time, without a per-user fee

List your equipment, set each preventive job to repeat by date, by run hours or whichever comes first, and this page tells you what is overdue, makes the work orders, keeps spare parts above their reorder point and scores your PM compliance. Its reliability section reads each machine's breakdown history and says whether scheduled replacement would actually help, and at what age.

For maintenance leads at small plants, food and packaging lines, workshops, schools and property portfolios who track PMs in a spreadsheet or pay per technician for a CMMS. Data stays in this browser; export it as a file. See what it does not do.

CSV columns read: name (or asset, equipment), location, category, inService (YYYY-MM-DD), meterUnit, criticality.

Dashboard

Overdue and due soon

StatusDueAssetTaskByMeterCompliance

Preventive workload, next 12 weeks

Estimated hours per ISO week from each plan's labour estimate; meter-driven jobs projected from each asset's usage rate.

WeekJobsHoursBy trade

Questions

Is there a free CMMS with no per-user fee?

This one. It runs in your browser with no account: add assets, preventive maintenance plans and spare parts, open and close work orders, and export everything as a JSON or CSV file. There is no user limit because there is no server; the data stays on your computer until you export it.

How do I schedule maintenance by run hours and by date at the same time?

Give the plan both a calendar interval and a meter interval. The planner fits a usage rate to the asset's meter readings, projects the day the meter reaches the next service, and makes the plan due on whichever comes first.

What is the difference between a fixed and a floating schedule?

A fixed schedule keeps its dates from the start date whatever day the job was done, which suits inspections due on set dates. A floating schedule counts the next interval from the day the job was last completed, which suits wear items.

How is PM compliance worked out?

Each completed preventive job counts as on time when it was done no later than its due date plus 10% of the interval (or 10% of the meter interval). Occurrences that came due and were never done count as missed. Compliance is on-time jobs over all jobs.

Does preventive replacement help every machine?

No. Replacing on a schedule only prevents failures that rise with age. The Reliability section fits a Weibull distribution to each asset's times between failures, counting the time since the last failure as still running, and reports whether the shape is clearly above 1 (wear-out), clearly below 1 (early-life failures) or cannot be told from random. With planned and failure costs it also gives the replacement age with the lowest cost per day.

Where is my data stored?

In this browser's local storage on your computer, and in the files you export. Nothing is uploaded. Clearing the browser's site data deletes it, so export a copy regularly.

Not modelled, and how it compares