FOR ELECTRICAL CONTRACTORS

Bid the run and the panel, not the charger.

A Level 2 EVSE is a continuous load. Size the breaker at 125%, pick copper that holds a 3% voltage drop for the actual run, then add trench hours and panel work. A 25-foot indoor hang on a spare slot is one job. The same 48 A charger on a 70-foot trench to a detached garage that also needs a service upgrade is several times that price — and a flat “EV charger install” quote cannot see the difference.

The job

Starting figures are common takeoff points, not a code opinion. Replace every length and hour with what you measured on this house.

Your costs

Payroll burden covers employer taxes, workers’ compensation (high in electrical), liability, and paid time off. Pricing off the raw journeyman rate is the most common reason a charger hang that looked profitable was not.

Questions electricians actually type

How much should I charge to install an EV charger?

There is no flat hang fee. Use this page: a short indoor 48 A job on a spare slot often lands near $1,200–$1,400 at the default rates. Switch the location to a detached garage, add a 60-foot trench, and pick a service upgrade — the same charger becomes a several-thousand-dollar job. That gap is the whole product.

What size breaker and wire does a 48 A charger need?

48 A continuous × 1.25 = 60 A breaker. Copper #6 usually carries that ampacity; a long run may upsize to hold 3% voltage drop at 240 V. The result panel shows the gauge and the calculated drop for the feet you entered.

Do I have to include a service upgrade?

Only if the existing service does not have the headroom. Enter the service rating and a honest existing-load estimate. If the new breaker is larger than the unused capacity, the tool flags it — it does not decide the upgrade for you, and it is not a permit load calculation. A 200 A service already estimated at 190 A of existing load has only 10 A of headroom; a 48 A charger needs a 60 A breaker, so that job gets flagged even though the panel itself has a free slot.

Why does a long run sometimes need thicker wire than the breaker alone requires?

Ampacity and voltage drop are two different limits. A 48 A charger's 60 A breaker is carried by #6 copper on ampacity alone, but at 160 feet that #6 run would sit past the 3% voltage-drop budget at 240 V. The calculator checks both and upsizes to #4 (1.98% drop at 160 ft) whenever the shorter-run wire would fail the drop check — the wire size shown is whichever limit binds for the feet you entered, not just the breaker size.

How much can a detached garage and a service upgrade add to the price?

At the default rates, a 48 A indoor hang on a spare slot with a 25-foot run prices near $1,263. Move the same charger to a detached garage with a 70-foot run, a 60-foot trench, and a service upgrade, and it prices near $4,587 — largely trench labor and restoration, the extra outdoor labor rate, and the 8 hours a service upgrade adds to the panel line. Same charger, almost 3.6× the price, because the job is not the charger.

What does the baseline comparison number mean?

The result panel prices your entered job against a fixed reference — the same wage, burden, overhead, and margin, but a 48 A indoor hang, 20-foot run, spare panel slot, no trench, no hardware. At the defaults that baseline prices near $1,189, so a $1,263 quote reads as about 6% over it. That reference is the "easy garage" number a customer often has in mind from a flat-fee ad; the ratio shows how far your actual job's numbers move it, not whether either price is right.

Hand the customer a proposal

The price above is for you. This is the page you print or save as a PDF and give to the customer — your details, their details, the scope, the deposit split, and a line for them to sign. Your business details are saved on this device so you only type them once; the customer’s details are never saved.

Everything on the printed page is text you typed or a number this calculator worked out. It contains no warranty, lien, or cancellation wording — those depend on your jurisdiction and your contract, and this tool is not the place to invent them.

Your bid

$—
installed price to the customer
Circuit
Recommended copper
Voltage drop
Labor hours
Loaded labor
Materials & permit
Overhead
Total cost
Profit at target margin
Effective hourly
Price per circuit amp
Walk-away price

Where the hours go


Transparent arithmetic from your own inputs. Breaker sizes, copper gauges, and hours are starting takeoff points — not a code ruling, a load calculation you can stamp, or a guarantee. Confirm against the charger nameplate, the adopted electrical code, and a qualified electrician.

Want the margin, walk-away price and overrun headroom as well, or pricing a different trade? Price this job in the Bid Price Engine, one calculator for 121 trades.