FOR PAVING CONTRACTORS

Bid the method, the thickness, and the extra work.

Price an asphalt driveway the way the trade actually loses money: overlay versus mill-and-overlay versus full-depth, mix tons from thickness, the street apron, failed base, and the sawcut at the garage. 800 square feet of sound asphalt is not the same bid as 1,000 square feet that has to come out. You get the price, the tons, the extra-work share, and the walk-away number below which the job loses money.

The driveway

Start from a common job, then replace every figure with your takeoff. Changing method never overwrites a rate you already typed. This is not a sealcoat calculator (coats and crack fill) and not a concrete-pour calculator (cubic yards of slab).

Your crew rates

A $38/h hand loaded at 32% is $50.16. Quoting the raw wage on a published $3.50-a-square-foot special is how a 1,000-square-foot full-depth that looked fine turns into a two-day loss after the first sawcut.

Your bid

$—
asphalt driveway paving price
Method and area
Thickness and extras
Hot-mix tons
Crew hours
Loaded labor
Mix, dump, gravel, tack, fees
Travel + equipment
Overhead
Total cost
Profit at this price
Price per square foot
Effective hourly rate
Walk-away price

A bid link carries your own rates — wage, burden, overhead, and target margin — so the page reopens exactly as you left it. Send it to yourself or your crew. The numbers ride after the #, which is never sent to a server, so copying a link uploads nothing. The customer should get the price, not the link.


Same driveway, three methods


Where the hours go


Where the cost goes


Transparent arithmetic from your own inputs. Starting hours and mix rates are common ballpark figures, not an industry standard, a paving specification, or a code determination — replace them with your own takeoff.

Hand the customer a proposal

The price above is for you. This is the page you print or save as a PDF and give to the customer — your details, their details, the scope, the deposit split, and a line for them to sign. Your business details are saved on this device so you only type them once; the customer’s details are never saved.

Everything on the printed page is text you typed or a number this calculator worked out. It contains no warranty, lien, or cancellation wording — those depend on your jurisdiction and your contract, and this tool is not the place to invent them.

Common questions

What does this paving estimate include?

The price adds up hot-mix tons for the driveway and apron by thickness, milling tons and dump cost for a mill-and-overlay, demo and dump tons for a full-depth replacement, a failed-base gravel patch, sawcut, tack coat, paving fabric when selected, a permit line, travel and equipment, overhead, and your target margin — all from the method, area, and rates you enter, not a flat price list.

Why does the same driveway price differently as an overlay, mill-and-overlay, or full-depth job?

Each method starts from its own suggested machine hours and material rates: a full-depth job adds demo and base-gravel hours an overlay never touches, and a mill-and-overlay adds milling hours and dump cost an overlay skips. The three-way comparison prices your same takeoff under each method’s starting kit so you can see when a failed base or a thick apron flips which method is actually cheaper.

Does it account for the street apron and a failed base separately from the driveway?

Yes. The apron is its own area and thickness, added to the driveway to get the total paved square footage that drives mix tons and most labor. A failed-base patch is a separate square footage and gravel thickness, capped at the paved area, and its gravel tons and hours only apply where you enter it.

Is my data uploaded anywhere?

No account and no network requests — the calculator runs entirely in your browser. Your bid is saved in this browser’s local storage between visits, and a bid link you copy carries those same numbers in the page’s URL hash rather than sending anything to a server.

What’s the difference between the bid price and the walk-away price?

The bid price already includes your target margin on top of labor, materials, and overhead. The walk-away price is the total cost underneath it — labor, mix, milling or demo dump, gravel, sawcut, and every other line item — the point below which the job stops being profitable at all.

Does this check pavement condition, code, or engineering requirements?

No. Hours and material rates are ballpark shop figures you can edit, not a paving specification, a pavement-condition assessment, or an engineering stamp. Deciding whether a driveway needs a full-depth rebuild rather than an overlay is still a call for the site visit; this tool only prices whichever method you tell it to.

Want the margin, walk-away price and overrun headroom as well, or pricing a different trade? Price this job in the Bid Price Engine, one calculator for 121 trades.